Check List
Daegu International Future Auto EXPO 2021

    Home > Exhibitor > Check List

Check list

Please complete all the necessary order forms and ensure all the deadlines.
Form Check List Deadline Date
- Application 31th Aug, 2021
Form 1 Company name board Compulsory 25th Sep, 2021
Form 3 Exhibitor's Badges Order Compulsory 25th Sep, 2021
Form 4 Booth Installation for Raw Space Optional 25th Sep, 2021
Form 5 Utility Services Optional 25th Sep, 2021
Form 6 Rental Furniture Optional 25th Sep, 2021
* If the Order Forms are not in attached files, Please apply online.

Carrying display product

· Light Product : 18 ~ 19 ( 08:00 ~ 18:00), October
· Heavy Product (by vehicles) : 19 (08:00 ~ 18:00) ~ 20( 08:00 ~ 14:00), October

※ No vehicles into exhibition hall from 19th , October

Customized Booth Installation

·10 ~ 20 ( 08:00 ~ 18:00), October 08:00 ~ 18:00

Packing & Carry-out

·17:00 ~ 08: 00 (10/24)

This manual is a necessary guide for preparation and exhibition process
* The detail will be decided later on.

Exhibitors using space-only booths should select a construction contractor only from the list of those officially designated by the secretariat, and report all chosen contractors to the secretariat.

The height of raw space booths on 1, 2 Halls of the new wing is not allowed to exceed the standard (6m) or the maximum
(7.5m incl. rigging).
The height of raw space booths on the 3 Hall of the old wing is not allowed to exceed the standard (4.5m) or the maximum
(6m incl. rigging).
The wall bordering another exhibitor’s booth shall be flat, 4m in height and have the backside that wall finished
(in color: white).
In case rigging exceeds 100kg in total, exhibitors must ask
the companies appointed by EXCO for construction; if rigging is less than 100kg, exhibitors can ask other companies for
construction after approval of the secretariat.

· Raw Space Exhibitors should submit all the construction document related online, VMS(EXCO online construction registration system) . The construction contractors who you select in the manual directly submit the document on VMS.

· Please choose the contractors on our website( www.difa.or.kr/eng)